- Koprivnica, Croatia
Carlsberg Croatia
Carlsberg Croatia is a part of the Carlsberg Group, established in Denmark in 1847. by brewer J.C. Jacobsen. Carlsberg Group is one of the leading brewery groups in the world today, with a large portfolio of beer and other beverage brands. Carlsberg Croatia's brewery, located in Koprivnica, is the most modern and best equipped brewery in the region.
Project description:
• Electrical installation of the can line
- installation, commissioning, maintenance and overhaul of machinery and installations for the bottling industry
Project duration: January 2022. - April 2022.
- 3. MAJ Shipyard JSC
734 - SCENIC ECLIPSE II
Luxurious passenger ship for cruising the polar regions
Long (m): 186,0
Wide (m): 21,5
- capacity to accommodate 237 passengers and a 200 member crew
Project description:
- according to the defined blueprints and schemes carrying out preparatory actions (lifting bobbins, stretching them using own tools), laying and bracing cables (clips and plastic ties) and closing the passages with modules
- dismantling of cable tracks and their return after laying
- handing over the completion of the works to the client's representative
- the works included 18,937m of cables
- planned tasks also included daily cleaning of the space from excess built-in materials and managing the tidiness of the space itself
Project duration: September 2021. - Present
- 3. MAJ Shipyard JSC
514 - SIEM ASHANTI
Car and truck carrier
Long (m): 200,0
Wide (m): 32,0
- has 13 decks on which it can transport 7,000 cars
Project description:
- according to the defined blueprints and list of materials - laying and bracing all the cables, mounting all the devices, inserting and connecting the cables to the electrical appliances, cargo space fans, lighting, lighting distributors and fire alarm.
- mark all wires and cables with appropriate markings.
- take all devices.
- test the functionality of the lighting
- mount nameplates and hand over the necessary programs to the shipowner and the registry
- planned tasks include daily cleaning of the space from excess built-in material and maintaining the orderliness of the space itself
Project duration: April 2021. - September 2022.
- 3. MAJ Shipyard JSC
723 - Santiago
Chemical Tanker
DWT: 50.000
Loa (m): 182,90
B (m): 32,20
H (m): 17,50
Project description:
• construction of cable trays, installing lighting, alarms, fire alarms and other small hardware according to the defined designs
• installing the electrometal equipment on the walls and ceiling, inserting cables, connecting electrical devices, alarm points, lighting, SUL equipment and fire alarm in the engine room, steering machine, hatch and chimney according to drawings
• marking all cores and cables with the appropriate markings
• testing the functionality of the lighting and performing proper grounding on all electrical devices
• installing the nameplates
Project duration: November 2020. - March 2022.
- Berlin, Germany
HeidelbergCement AG
HeidelbergCement is one of the world’s largest building materials companies and the No. 1 in aggregates production and No. 2 in cement and ready-mixed concrete.
Project description:
- cable tray installation
- pulling, tracing and connecting cables
- cabinet installation and connection
- final works - completing the installation job
Project duration: February 2022.
- Kampala, Uganda
HAKUNA MATATA SAL
Project description:
- disassembly - assembly - start up complete pet line SBO08
- disassembly - assembly - start up complete pet lines: line 2 - line 3
first phase: dismantling operation on the first line
second phase: installation
Project duration: June 2022. - September 2022.
- Las Palmas de Gran Canaria, Spain
Saipem Constellation
Saipem Constellation is a pipelay crane vessel that was built in 2014. and is sailing under the flag of Bahamas. It's carrying capacity is 32000 t DWT and current draft is reported to be 9.3 meters. It's length overall (LOA) is 178 meters and width is 45.99 meters.
Project description:
- switchboard cleaning and maintenance on board
Project duration: February 2022. - March 2022.
- Las Palmas de Gran Canaria, Spain
Saipem FDS2
Saipem FDS2 is a crane ship that was built in 2011. and is sailing under the flag of Bahamas. It’s carrying capacity is 29500 t DWT and current draught is reported to be 9.3 meters. It's length overall (LOA) is 183.6 meters and width is 32.2 meters.
Project description:
- cable pulling
- termination of cabeling
Project duration: February 2022.
- Cesena, Italy
AMADORI S.R.L.
Amadori is one of the leading companies in the Italian agro-food sector, an innovative company and specialist in the poultry market.
Project description:
- electrical installation services
- installation, commissioning, maintenance and overhaul of machinery
Project duration: March 2022. / September 2022. - October 2022.
- Viktor Lenac Shipyard, Croatia
Viktor Lenac shipyard is situated on the northern Croatian Adriatic coast and from 2018. is part of the Italian shipyard group - Palumbo group S.P.A.
Project description:
• Electrical installation services on vessels:
MSC ALYSSA
514 - SIAM ASHANTI
TEG 29 - FIUMANKA
TRSAT
ANGELINA AMORETTI
AMBRA
BF FILLIP
USNS CARSON CITY
BONNY RIVER
NAVIGATOR JORF
LEALE
USNS BRUCE CHEEZEN
LAURA BASSI
USNS YUMA
DUBROVNIK
IBN BATTUTA
EMERALD
m/v DELPHIN
PRINCE ABDULAZIZ
Description of works:
- construction of cable trays
- inserting cables according to schemes
- maintenance and inspection of equipment
- marking all cores and cables with the appropriate marking
Project duration: April 2022. - December 2022.
ZAPPHIRE
- installation of the BWTS system according to the delivered documentation according to the "turnkey" system
- 3.176 m of cable passed through
Duration of works: July 2022. - August 2022.
POL STELLA
- installation of the BWTS system according to the supplied documentation
Duration of works: August 2022.
IEVOLI SPRINT
- installation of 2 cables, each 14 meters long (based on changes/design errors in the original design related to cable lengths / BWMS PDU 02 and BWMS CL 01 / and agreement with the service technician) from the electrical cabinet in the main switchboard to the positions in Heather room
- installation
- bragging
- creation and installation of additional foundations for electricity boxes of limit switches and switches in the pumping station (7
foundations - dimensions 150 x 150 mm, mounting on the wall)
- connection of electricity cables for limit switches (7 pcs.)
- additional installation of approx. 102m cable
- cable pulling
- electrical assembly cabinets FV3 / FV4 PANEL, dim. 600mm x 400mm, mounting on the wall in the Cargo heating Room, connecting to the electric switchboards
- electrical assembly cabinets COOLING PUMP PANEL, dim. 400mm x 300mm, mounting on the wall in the Cargo Heating Room
- installation of the BWTS system according to the supplied documentation
- locksmith works on production and assembly: foundations of electrical equipment, cable passages and cable routes
- installation of electrical equipment, installation of switches
- assembly and connection of cables, making the final megger test
Duration of works: October 2022.
AMBER BEE
Description of works:
- installation of the BWTS system according to the supplied documentation
- locksmith works on production and assembly: foundations of electrical equipment, cable passages and cable routes
- installation of electrical equipment, installation of switches
- assembly and connection of cables, making the final megger test
Duration of works: November 2022. - December 2022.
- Columbia, USA
Ziemann Holvrieka GmbH - Mark Anthony Brewing - USA -Hard seltzer production
Ziemann Holvrieka provides individual and tailor-made solutions for the beer, beverage and liquid food industries from a single source.
Anthony Brewing, as the 4th largest brewer in the United States, provides supply chain management and brewing services for The Mark Anthony Group of Companies.
Project description:
- the service of performing assembly works and supervising assembly on the project
- installation of shelves, distribution cabinets, laying and connection of cables
Marking complete equipment with stainless steel nameplates:
- sorting nameplates by technological parts of the plant
- finding the equipment according to the P&ID documentation
- attaching name plates
Project duration: April 2022. - May 2022.
- Bolzano, Italy
SCHENK ITALIA S.P.A.
Schenk Italian Wineries are among the most significant wineries on a national level. Founded in 1952. in Reggio Emilia, in 1960. the company moved its headquarters to Ora (BZ), where the first winery linked to the production area was born.
Project description:
- line disassembly: glass line disassembly - Zecchetti depalletiser and Krones filler
Project duration: May 2022.
- Karlovy Vary, Czech Republic
PERNOD RICARD CZECH REP.
Jan Becher - Karlovarská Becherovka, a. s., is a company with Czech roots, yet global reach. Since 1997. we have been part of the global Pernod Ricard Group, ranking second amongst the world’s wine and spirit producers and distributors. Pernod Ricard offers 240 premium brands of alcoholic beverages in more than 160 countries with a clear ambition to become a leader in the field.
Project description:
- bottle and packs conveyor installation
Project duration: May 2022. - June 2022.
- Vergeze, France
NESTLE WATERS SUPPLY SUD - VERGEZE
Nestlé Waters is a Swiss multinational bottled water division of Nestlé (the world's largest food & beverage company). It was founded in 1992.
Project description:
- conveyor installation - SIDEL
Project duration: May 2022. - August 2022.
- Savona, Italy
FONTE VALLECHIARA - SAVONA
Fonte Vallechiara Savona is part of the Terme Vallechiara SRL - soft drinks, mineral waters and other bottled waters supplier
Project description:
- line disassembly
Project duration: June 2022. - July 2022.
- Kildare, Ireland
ALCRETE BUILDING SYSTEMS LTD.
Alcrete Building Systems Limited (set up 2015.) specialise in a complete range of precast concrete building components for both residential and commercial markets.
Project description:
- dismantling of a precast machine
Project duration: July 2022. - November 2022.
- Nersingen, Germany
OBERE - DONAU - KRAFTWERKE AG
(Obere-Donau-Kraftwerke AG is power plant - part of the LEW Wasserkraft GmbH that is a subsidiary
of Augsburger Lechwerke AG)
Project description:
- Construction of cable trays
- Cabeling
- Installation of switchgear cabinets
- Connection works and remaining tasks
Project duration: September 2022. - November 2022.
- Hürth, Germany
EON GSH
(EON is one of Europe's largest operators of energy networks and energy infrastructure, and a provider of innovative customer solutions)
Project description:
- Construction of cable trays
- Cabeling
- Installation of switchgear cabinets
- Connection works and remaining tasks
Project duration: September 2022. - November 2022.
- Leißling, Germany
MEG Leißling GmbH
(MEG is Schwarz Production's beverage and recycling network. It is one of the leading beverage bottlers in Germany)
Project description:
- electrical installation
Project duration: September 2022. - October 2022.
- Rinteln, Germany
riha WeserGold Getränke GmbH & Co. KG
(riha WeserGold Getränke GmbH & Co. KG is an international beverage company and the largest German fruit juice and fruit nectar manufacturer)
Project description:
- electrical installation of Krones new glass depaletizer, filler, bottle and pallet conveyors
Project duration: September 2022. - October 2022.
- Eilenburg, Germany
FRANKEN BRUNNEN GMBH & CO.KG
(Franken Brunnen GmbH & Co. KG is a mineral water company based in Neustadt an der Aisch in Bavaria)
Project description:
- dismantling machines
- assembly of the machines
Project duration: September 2022. - October 2022.
- Bük, Hungary
NESTLE HUNGARIA KFT.
(Nestlé Hungária Kft. was founded in 1991. The company has four Hungarian factories: in Szerencs it manufactures coffee and cocoa products, in Diósgyőr it produces hollow chocolate figures, Bük is the regional pet food center while in Kékkút the company bottles mineral water.)
Project description:
- electrical connection works
Project duration: September 2022.
- Vittel, France
NESTLE WATERS SUPPLY EST - VITTEL
Nestlé Waters is a Swiss multinational bottled water division of Nestlé (the world's largest food & beverage company). It was founded in 1992.
Project description:
- dismantling all machines and conveyors of the PET lines N1 & N7 (Plant VITTEL north) which will be reused on the new multi formats line L3 HEPAR (Plant VITTEL South)
- adding some new bottle conveyors, packs conveyors and machines
- dismantling the existing air conveyors of N07 line in order to reinstall them with some modification on the new line L3
Project duration: September 2022. - November 2022.
- Schongau, Germany
KRAFTWERK FINSTERAU
Hydropower Plant
Project description:
- Construction of cable trays
- Cabeling
- Installation of switchgear cabinets
- Connection works and remaining tasks
Project duration: October 2022.
- Jessen, Germany
MEG JESSEN GmbH
(MEG is Schwarz Production's beverage and recycling network. It is one of the leading beverage bottlers in Germany)
Project description:
- electrical installation of 2 KHS palletizer + packet conveyor + pallet conveyor
Project duration: November 2022.
- Selles, France
PUR NATUR INVEST NV
(Pur Natur NV is a dairy products manufacturer. The Company offers milk, cream, yogurt, butter, and ice cream. Pur Natur conducts business in Belgium. Pur Natur France is situated in Selles.)
Project description:
- electrical installation services
Project duration: November 2022.
- Perenchies, France
ROXANE NORD
Roxane Nord was founded in 1991. The Company's line of business includes the manufacturing of soft drinks and carbonated waters.
Project description:
- electrical installation services
Project duration: November 2022. - December 2022.
- Koromačno, Croatia
HOLCIM
Holcim Croatia (Portland cement factory in Koromačno) is part of the Holcim Group, which was formed in July 2015. by the merger of two leading companies in the field of construction materials: Lafarge and Holcim.
Project description:
• Reconstruction of TS5 and raw material tunnel
- installation of PNT pipe and cabinet of buttons for emergency shutdown + laying cables
- laying cables 6/10kV 3x1x95mm along the existing shelves in the energy tunnel in a length of approximately 120 m
Project duration: December 2022. - Februray 2023.
- Marseille, France
HEINEKEN Entreprise - Marseille
(Heineken N.V. is a Dutch multinational brewing company, founded in 1864. by Gerard Adriaan Heineken in Amsterdam. As of 2019, Heineken owns over 165 breweries in more than 70 countries. It produces 348 international, regional, local and speciality beers and ciders.
The HEINEKEN ENTREPRISE establishment has specialized in the production and packaging of beers in France with distribution to breweries.)
Project description:
- electrical installation services
Project duration: December 2022. - January 2022.
February 2022.
- Rugby, UK
BRITVIC SOFT DRINKS LTD
Britvic is an international soft drinks manufacturer, founded in the 1930s, with more than 35 brands selling in over 100 countries.
Project description:
- electrical installation services
Project duration: December 2022.