Steinbach Vertriebs GmbH

(Company has a large product portfolio in the area of swimming pools: pools, filter systems, pool accessories, heating systems, maintenance, pool covers, installation parts and inflatable goods)

 

Project description:

- Electrical installation of pallet conveying plant 

- Electrical cabinet installation, as well as cabling, cable routing, cable connection and labeling

- Cabinet installation and connection

- Cable tray and pipes installation

- Pulling, tracing and connecting cables

- Support for I/O Check

- Final works - completing the installation job

 

Project duration: November 2020. - December 2020.

 

Stadtwerke Münster GmbH

(Municipal company, 100 % owned by the city of Münster, that supplies with electricity, natural gas, district heating and drinking water. It also operates the city's bus network, port and street lighting.)

 

Project description:

- Construction of cable trays 

- Cabeling 

- Installation of switchgear cabinets

 

Project duration: October 2020. - November 2020.

 

Obere-Donau-Kraftwerke AG - Kraftwerk Günzburg

(Company founded in 1958., subsidiary of the Rhein-Main-Donau GmbH, based in Landshut, owns six hydroelectric power plants on the upper Danube between Ulm and Dillingen)

 

Project description:

- Construction of cable trays 

- Installation of switchgear cabinets

- Cabeling 

- Cabeling optical fibre

- Assembly DC-system

- Connection works

 

Project duration: September 2020. - October 2020.

 

Kraftwerk Maria Steinbach

(Barrage)

 

Project description:

- Cable tray and cable instalation

- Erection of electrical panels

- Connection of cables

 

Project duration: September 2020. - October 2020.

 

Kläranlage Wesel

(Wastewater treatment plant)

 

Project description:

- Disassembly cabinets, demolition of cable routes, remaining tasks

 

Project duration: August 2020.

 

Kläranlage Geldern

(Sewage plant)

 

Project description:

- Cable tray and pipes installation

- Cabinet installation and connection

- Pulling, tracing and connection of cables

- Support for I/O Check

 

Project duration: July 2020.

 

Rhein-Main-Donau AG - Kraftwerk Ellgau

(Rhein-Main-Donau AG  is a private infrastructure company based in Munich that provides power supply from hyrdropower and water)

 

Project description:

- Construction of cable trays 

- Installation of switchgear cabinets

- Cabeling 

- Disassembly of switchgear cabinets

- Connection works and remaining tasks

 

Project duration: July 2020. - August 2020.

 

Obere-Donau-Kraftwerke AG - Kraftwerk Leipheim

(Company founded in 1958., subsidiary of the Rhein-Main-Donau GmbH, based in Landshut, owns six hydroelectric power plants on the upper Danube between Ulm and Dillingen)

 

Project description:

- Construction of cable trays 

- Cabeling 

- Installation of switchgear cabinets

- Connection works and remaining tasks

 

Project duration: July 2020.

 

Sul Bulk Carrier

DWT:  31.070

Loa (m):  198,35

B (m):  23,77

H (m):  13,58

 

Project description:

• construction of cable trays, installing lighting, alarms, fire alarms and other small hardware according to the defined designs

• installing the electrometal equipment on the walls and ceiling, inserting cables, connecting electrical devices, alarm points, lighting, SUL equipment and fire alarm according to the drawings

• marking all cores and cables with the appropriate markings

• testing the functionality of the lighting and performing proper grounding on all electrical devices

• installing the nameplates

 

Project duration: February 2020. - September 2020.

 

Obere-Donau-Kraftwerke AG - Kraftwerk Leipheim

(Company founded in 1958., subsidiary of the Rhein-Main-Donau GmbH, based in Landshut, owns six hydroelectric power plants on the upper Danube between Ulm and Dillingen)

 

Project description:

- Construction of cable trays 

- Cabeling 

- Installation of switchgear cabinets

- Connection works and remaining tasks

 

Project duration: March 2020.

 

(The largest solar power plant in Croatia)

 

Work description:

- laying of medium and low voltage cables

- wiring of transformer containers

- installation of solar string boxes and pulling off the solar cables

- laying of medium voltage 20kW cable from solar containers to HEP's substation

 

Project duration: December 2019 - February 2020

 

(Production, storage and logistics of propene and propane in the Rijeka oil refinery)

 

PROPANE / PROPYLENE SPLITTER project (PPS U-391 and PPS TANK SPACE U-335 I INTERCONNECTING)

 

Work description:

- Electro-instrumentation works

- Welding works

- Locksmithing

 

Project duration: September 2019 - March 2020