- Schwertberg, Austria
Steinbach Vertriebs GmbH
(Company has a large product portfolio in the area of swimming pools: pools, filter systems, pool accessories, heating systems, maintenance, pool covers, installation parts and inflatable goods)
Project description:
- Electrical installation of pallet conveying plant
- Electrical cabinet installation, as well as cabling, cable routing, cable connection and labeling
- Cabinet installation and connection
- Cable tray and pipes installation
- Pulling, tracing and connecting cables
- Support for I/O Check
- Final works - completing the installation job
Project duration: November 2020. - December 2020.
- Münster, Germany
Stadtwerke Münster GmbH
(Municipal company, 100 % owned by the city of Münster, that supplies with electricity, natural gas, district heating and drinking water. It also operates the city's bus network, port and street lighting.)
Project description:
- Construction of cable trays
- Cabeling
- Installation of switchgear cabinets
Project duration: October 2020. - November 2020.
- Günzburg, Germany
Obere-Donau-Kraftwerke AG - Kraftwerk Günzburg
(Company founded in 1958., subsidiary of the Rhein-Main-Donau GmbH, based in Landshut, owns six hydroelectric power plants on the upper Danube between Ulm and Dillingen)
Project description:
- Construction of cable trays
- Installation of switchgear cabinets
- Cabeling
- Cabeling optical fibre
- Assembly DC-system
- Connection works
Project duration: September 2020. - October 2020.
- Legau-Maria Steinbach, Germany
Kraftwerk Maria Steinbach
(Barrage)
Project description:
- Cable tray and cable instalation
- Erection of electrical panels
- Connection of cables
Project duration: September 2020. - October 2020.
- Wesel, Germany
Kläranlage Wesel
(Wastewater treatment plant)
Project description:
- Disassembly cabinets, demolition of cable routes, remaining tasks
Project duration: August 2020.
- Geldern, Germany
Kläranlage Geldern
(Sewage plant)
Project description:
- Cable tray and pipes installation
- Cabinet installation and connection
- Pulling, tracing and connection of cables
- Support for I/O Check
Project duration: July 2020.
- Ellgau, Germany
Rhein-Main-Donau AG - Kraftwerk Ellgau
(Rhein-Main-Donau AG is a private infrastructure company based in Munich that provides power supply from hyrdropower and water)
Project description:
- Construction of cable trays
- Installation of switchgear cabinets
- Cabeling
- Disassembly of switchgear cabinets
- Connection works and remaining tasks
Project duration: July 2020. - August 2020.
- Leipheim, Germany
Obere-Donau-Kraftwerke AG - Kraftwerk Leipheim
(Company founded in 1958., subsidiary of the Rhein-Main-Donau GmbH, based in Landshut, owns six hydroelectric power plants on the upper Danube between Ulm and Dillingen)
Project description:
- Construction of cable trays
- Cabeling
- Installation of switchgear cabinets
- Connection works and remaining tasks
Project duration: July 2020.
- 3. MAJ Shipyard JSC
Sul Bulk Carrier
DWT: 31.070
Loa (m): 198,35
B (m): 23,77
H (m): 13,58
Project description:
• construction of cable trays, installing lighting, alarms, fire alarms and other small hardware according to the defined designs
• installing the electrometal equipment on the walls and ceiling, inserting cables, connecting electrical devices, alarm points, lighting, SUL equipment and fire alarm according to the drawings
• marking all cores and cables with the appropriate markings
• testing the functionality of the lighting and performing proper grounding on all electrical devices
• installing the nameplates
Project duration: February 2020. - September 2020.
- Leipheim, Germany
Obere-Donau-Kraftwerke AG - Kraftwerk Leipheim
(Company founded in 1958., subsidiary of the Rhein-Main-Donau GmbH, based in Landshut, owns six hydroelectric power plants on the upper Danube between Ulm and Dillingen)
Project description:
- Construction of cable trays
- Cabeling
- Installation of switchgear cabinets
- Connection works and remaining tasks
Project duration: March 2020.
- Solar Power Plant ''Vis''
(The largest solar power plant in Croatia)
Work description:
- laying of medium and low voltage cables
- wiring of transformer containers
- installation of solar string boxes and pulling off the solar cables
- laying of medium voltage 20kW cable from solar containers to HEP's substation
Project duration: December 2019 - February 2020
- INA
(Production, storage and logistics of propene and propane in the Rijeka oil refinery)
PROPANE / PROPYLENE SPLITTER project (PPS U-391 and PPS TANK SPACE U-335 I INTERCONNECTING)
Work description:
- Electro-instrumentation works
- Welding works
- Locksmithing
Project duration: September 2019 - March 2020